Aluminium Formworks and Accessories
Advantages of VA Formwork
- Allows for early striking by removing of mid link slab leaving the prop undisturbed as backdrop.
(Vertical panel can be removed after 12 hours & horizontal panels after 36 hours.) - With the velocity of 7 days per floor, min 3-4 floors in a month. All structural elements can be casted in one operation.
(WALLS, COLUMNS, BEAMS, SLABS, DROPS, ARCHITRAVES, ETC)