Aluminium Formworks and Accessories

Advantages of VA Formwork

  • Allows for early striking by removing of mid link slab leaving the prop undisturbed as backdrop.
    (Vertical panel can be removed after 12 hours & horizontal panels after 36 hours.)
  • With the velocity of 7 days per floor, min 3-4 floors in a month. All structural elements can be casted in one operation.
    (WALLS, COLUMNS, BEAMS, SLABS, DROPS, ARCHITRAVES, ETC)